鋼結(jié)構(gòu)活動(dòng)板房地基處理方式!

來源:http:// 日期:2023-11-13 發(fā)布人:
鋼結(jié)構(gòu)活動(dòng)板房是目前使用為廣泛的臨時(shí)住房建筑,雖然活動(dòng)房的主要骨架是鋼結(jié)構(gòu)的,但它的地基可不是,大多數(shù)地基是混凝土結(jié)構(gòu)的,鋼結(jié)構(gòu)活動(dòng)板房對(duì)地基的硬度有一定要求,地基的硬度決定了要不要做特殊處理,打好地基對(duì)于工程來說關(guān)重要。
Steel structure prefabricated houses are currently widely used temporary housing buildings. Although the main skeleton of the prefabricated house is steel structure, its foundation is not. Most foundations are concrete structures, and steel structure prefabricated houses have certain requirements for the hardness of the foundation. The hardness of the foundation determines whether special treatment is necessary, and laying a good foundation is crucial for the project.
1.要進(jìn)行硬度測(cè)試,特殊的地形和地基的硬度對(duì)建造活動(dòng)房來說有較大的差別,應(yīng)當(dāng)作特殊的處理,保證鋼結(jié)構(gòu)活動(dòng)板房可以順利安裝,確保其質(zhì)量,技術(shù)人員應(yīng)該提前進(jìn)行測(cè)量。
Firstly, hardness testing should be conducted. Special terrain and foundation hardness have significant differences for the construction of prefabricated houses, and special measures should be taken to ensure the smooth installation of steel structure prefabricated houses and their quality. Technical personnel should conduct measurements in advance.
2.完成了地基的測(cè)量后,接下來就是基礎(chǔ)澆筑,這時(shí)的在于必須先測(cè)量好水平,在完成了澆筑后,應(yīng)該控制水平的誤差在10mm內(nèi)。必須要保證基礎(chǔ)面水平在誤差以內(nèi),這樣才不會(huì)影響后續(xù)的工作進(jìn)程。
禹城鋼結(jié)構(gòu)板房
After completing the measurement of the foundation, the next step is foundation pouring. At this point, the key is to measure the level first. After completing the pouring, the horizontal error should be controlled within 10mm. It is necessary to ensure that the level of the foundation surface is within the error range, so as not to affect the subsequent work process.
3.混凝土標(biāo)號(hào),一般情況下基礎(chǔ)為c20且內(nèi)無鋼筋,當(dāng)然,在特殊的地形或者其他不可抗拒的條件下,應(yīng)當(dāng)根據(jù)技術(shù)人員的測(cè)定來頂下終方案。
3. Concrete grade, usually based on c20 and without steel bars inside. However, in special terrain or other irresistible conditions, the final plan should be determined based on the determination of technical personnel.
4.澆注時(shí)間,跟常規(guī)的混凝土澆筑工藝一樣,鋼結(jié)構(gòu)活動(dòng)板房同樣不可以減少工藝程序,基礎(chǔ)澆筑完成后或者活動(dòng)板房安裝之前應(yīng)該留充分的時(shí)間讓混凝土達(dá)到硬度要求。
4. Pouring time: Like conventional concrete pouring processes, steel structure prefabricated houses cannot reduce the process procedures. After the foundation pouring is completed or before the installation of the prefabricated house, sufficient time should be left to ensure that the concrete meets the hardness requirements.
5.澆筑,制作基礎(chǔ)的同時(shí),必須跟室內(nèi)地面一起澆筑完成,水平高度跟基礎(chǔ)一樣,這樣可以確保安裝工期、質(zhì)量以及安裝后的美觀?;顒?dòng)板房安裝好了以后,在室內(nèi)鋪地板,這樣既方便又整潔。
5. Pouring, while making the foundation, must be completed together with the indoor floor, with the same horizontal height as the foundation, to ensure the installation period, quality, and aesthetics after installation. After the installation of the prefabricated house, the floor should be laid indoors, which is both convenient and tidy.

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號(hào))

地址:禹城市十里望鎮(zhèn)山東國(guó)際商貿(mào)港往南660米

備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

日本簧片在线观看| 人妻少妇精品视频二区| 美丽的熟妇中文字幕| 亚洲av无码一区二区二三区我| 欧美日韩精品乱国产| 亚洲成AV人片天堂网久久| 宁强县| 亚洲av成人午夜福利在线观看| 日本在线看片免费人成视频1000| 久久99精品九九九久久婷婷| 精品久久久久久无码中文野结衣| 激情综合色五月丁香六月欧美| 亚洲午夜无码久久久久小说| 亚洲成av人片乱码色午夜| 欧美性熟妇| 国产女人18毛片水多18精品| 日韩亚洲变态另类中文| 婷婷在线| 亚洲av吞精久久久久| 国产福利91精品张津瑜| 91丨九色丨蝌蚪熟女露脸| 欧美成人精品一区二区三区在线观看| 超碰在线91| 欧美福利一区| 我要看黄色一级片| 在线看h片| 中文字幕一区二区三区四区| 大香蕉尹人在线| 国产传媒专区| 亚洲av天堂av在线成人播放| 亚洲乱 亚洲乱 亚洲| 你懂的在线看| 黑人xxx| 老熟女高潮一区二区三区| 国产麻豆91欧美一区二区| 日本理伦片午夜理伦片| 久久精品噜噜噜成人| 濮阳县| 精品一区二区无码av| 亚洲综合成人婷婷五月网址| 亚洲伊人久久大香线蕉AV|