您好,歡迎訪問禹城泰瑞彩鋼復(fù)合板加工廠!

服務(wù)熱線

18765446878

熱門關(guān)鍵詞:禹城彩鋼廠,禹城彩鋼復(fù)合板,禹城鋼結(jié)構(gòu)板房 彩鋼板房
當(dāng)前位置:首頁>新聞資訊>新聞動態(tài)安裝工程板房需要注意的事項

安裝工程板房需要注意的事項

來源:http:// 日期:2020-07-01 發(fā)布人:
我們在安裝工程板房的前,應(yīng)該先去了解安裝過程中應(yīng)格外注意的事項,避免施工中出現(xiàn)故障。為了保證工程板房的施工質(zhì)量,我們選擇的工作人員進(jìn)行操作。今天小編在這里主要為大家講解安裝工程板房應(yīng)該注意的事項。
Before we install the engineering panel room, we should first understand the safety matters that should be paid special attention to in the installation process, so as to avoid the failure in the construction. In order to ensure the construction quality of the project board room, we choose professional staff to operate. Today, the small editor is here to explain the installation project board room should pay attention to the matters.
1、工程板房安裝位置的選擇。安裝位置一定要合理的選擇,需要選擇地面平整的區(qū)域,將板房運(yùn)輸?shù)侥康牡兀M(jìn)行相關(guān)部件的安裝,安裝后,再固定在地面上。
1. Selection of installation position of Engineering panel room. The installation position must be selected reasonably, and the area with flat ground should be selected. Firstly, the panel room should be transported to the destination for the installation of relevant parts, and then fixed on the ground after installation.
2、其次,在安裝前,我們還需要檢查購買的工程板房質(zhì)量,板房連接部分的密封性能如何,是否符合防潮、防水、防火等優(yōu)良的特性。
2. Secondly, before installation, we also need to check the quality of the purchased engineering panel room, the sealing performance of the connection part of the board room, and whether it conforms to the excellent characteristics of moisture-proof, waterproof and fireproof.
濟(jì)南工程板房
3、工程板房的外墻安裝要按照裝配圖安裝。在安裝之前,應(yīng)該將外墻板進(jìn)行擦洗,確保表面質(zhì)量好,外墻板接縫,應(yīng)順?biāo)鞣较蚱唇印?/div>
3. The external wall installation of Engineering panel room shall be in accordance with the assembly drawing. Before installation, the exterior wall panel should be scrubbed to ensure good surface quality. The joints of exterior wall panel should be spliced along the water flow direction.
4、先對地梁、立柱進(jìn)行安裝,安裝順序柱—圈梁—調(diào)節(jié)拉桿,走道托架可以隨著柱一起安裝,在地面將走道托架與柱連接,為一體,立柱安裝后,應(yīng)立即安裝圈梁和調(diào)節(jié)拉桿。
4. The ground beam and column shall be installed first, and the installation sequence is column ring beam adjusting rod. The corridor bracket can be installed along with the column. The corridor bracket and column are connected as a whole on the ground. After the column is installed, the ring beam and adjusting rod shall be installed immediately.
5、安裝窗戶,窗戶安裝時候,要保證窗框線與窗洞口上所畫線重合。
5. When installing the window, ensure that the center line of the window frame coincides with the center line drawn on the window opening.
6、安裝工程板房的門。門外框、門把頭、門頭板、門扇、鎖具插銷、打膠等步驟。
6. Install the door of Engineering panel room. Door frame, door handle head, door headboard, door leaf, lock bolt, gluing and other steps.
以上的內(nèi)容就是小編為大家講解的安裝工程板房應(yīng)該注意的內(nèi)容,喜歡我們產(chǎn)品的朋友可以來電進(jìn)行咨詢,期待您的來電。
The above content is the content of installation engineering board room should pay attention to, like our products friends can call for consultation, looking forward to your call.

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮(zhèn)山東國際商貿(mào)港往南660米

備案號:魯ICP備2023024436號 魯公網(wǎng)安備37010202001695號 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

亚洲熟妇AV一区二区三区浪潮| 成熟丰满熟妇av无码区| 97人伦色伦成人免费视频| 久久久久人妻一区二区三区| 亚洲熟妇无码一区二区三区| 久久AV无码专区亚洲AV桃花岛| 老司机福利在线观看| 92国产精品午夜福利免费| 妺妺窝人体色www婷婷| 狠狠干网站| 在线观看网址你懂的| 美女高潮潮喷出白浆视频| 久久强奷乱码老熟女| 在线欧美日韩制服国产| 久久精品国产99久久六动漫| 动漫成人无码精品一区二区三区| 国产h在线| 91日韩在线| 久久3| 亚洲天堂中文| 四影虎库ww4htu| 人妻色综合| 欧美日韩av| 丝袜+亚洲+另类+欧美+变态| 日韩精品无码二区| 国内偷窥一区二区三区视频| 亚洲乱码中文字幕在线| 扒开双腿猛进入喷水高潮视频| 2020天堂在线亚洲精品专区 | 寂寞熟妇国产激情久久久| 国产三级av在线播放| 国产成人a在线观看视频| 浮妇高潮喷白浆视频| 无码免费一区二区三区| 18禁无遮挡无码国产免费网站 | 亚洲AV无码成H人动漫在线观看| 连城县| 武安市| 亚洲欧美人高清精品a∨| 大肉大捧一进一出好爽| 亚洲人成影视|